01 Hero · Nissan Qashqai Classic Glory projector case

2025

Nissan Qashqai Classic Glory Matrix Retrofit

Four Modules per Lamp · Position-Specific Sizes

INSTALLATION REFERENCE

2025 Qashqai Classic Glory four-matrix conversion with outer 1.5–1.8 inch and inner 1.5–1.7 inch positions, Nissan decoder, harness power and dedicated-high-beam spacer guidance.

◇ Nissan Qashqai Classic Glory ◇ Configuration-Specific Carrier

View Installation Guide

Nissan Qashqai Classic Glory front headlampNissan Qashqai Classic Glory Reference
02 Vehicle application

Nissan Qashqai Classic Glory Application

Models
Nissan Qashqai Classic Glory
Years
2025
Headlamp
Pictured pictured original Classic Glory headlamp; heat-softening sealant
Layout
Four matrix modules per lamp; outer positions fit 1.5–1.8 inch, inner positions fit 1.5–1.7 inch
Factory Parts
Transfer original ball-head screw; restore DRL and locally relieved trim frame
Four Modules per Lamp · Position-Specific Sizes kit
Four Matrix Modules per Lamp

Eight across the pair. Outer: 1.5–1.8 inch; inner: 1.5–1.7 inch.

Nissan Decoder + Harness Power

Use the specified decoder and a wiring harness for power.

Inner High-Beam Spacers

Dedicated high-beam modules require the supplied plastic spacers to match the illustrated assembly length.

03 Configuration details

Driver-Side Components, Clips and Ball Stud

Identify Driver-Side Parts

Step 01

Identify Driver-Side Parts

Match the main carrier, clip accessory and module plates.

Install the Clip Components

Step 02

Install the Clip Components

Fit the illustrated white, black and blue clips in their shown positions.

Transfer the OEM Ball Stud

Step 03

Transfer the OEM Ball Stud

Remove the original ball-head screw and install it on the replacement carrier.

04 Compatibility notice

Confirm the Lamp, Carrier and Module Selection

Documented Configuration

  • 2025 Qashqai Classic Glory reference lamp
  • Four modules per lamp with different outer/inner size ranges
  • Nissan decoder and wiring-harness power
  • Supplied plastic spacers for inner dedicated-high-beam modules

Do Not Assume

  • Inner positions accept the full outer 1.5–1.8 inch range
  • Every dedicated high-beam module uses identical spacer thickness
  • The outermost slots should always be set fully outward
  • A universal numbered connector pinout is supplied

Request Matching

Send lamp labels, module dimensions and the intended configuration.

Request Verification

05 Installation process

Installation Sequence

Open the Front Cover

Step 01

Open the Front Cover

The source identifies OEM heat-softening sealant.

Remove the Hidden Trim Screws

Step 02

Remove the Hidden Trim Screws

Two additional screws sit below the black trim frame.

Remove the OEM Ball-Head Screw

Step 03

Remove the OEM Ball-Head Screw

Keep it for transfer to the replacement carrier.

Fit the Matrix Carrier Plates

Step 04

Fit the Matrix Carrier Plates

Install the plates after preparing clips and transferring the original ball stud.

Check Outer Carrier Orientation

Step 05

Check Outer Carrier Orientation

Match the outer plate orientation shown in the side view.

Install the Position-Matched Modules

Step 06

Install the Position-Matched Modules

Outer positions use 1.5–1.8 inch modules; inner positions use 1.5–1.7 inch modules.

Set the Outermost Slotted Mount

Step 07

Set the Outermost Slotted Mount

With 1.5–1.7 inch projectors, move the outermost module inward as far as possible as illustrated.

Install the Assembly in the Housing

Step 08

Install the Assembly in the Housing

Secure the completed carrier and check body and wiring clearance.

Set Inner Group Height

Step 09

Set Inner Group Height

Use the illustrated independent height adjustment for the inner projector group.

Restore the DRL

Step 10

Restore the DRL

Reinstall the daytime-running light.

Relieve the Trim Frame Locally

Step 11

Relieve the Trim Frame Locally

Trim the center section and the separate illustrated upper section to prevent interference.

Connect, Test and Finish

Step 12

Connect, Test and Finish

Use the Nissan decoder and harness power. Refit trim, check all module clearances, low/high operation, warning behavior and aim before resealing.

05B Outer and inner module selection

Different Size Ranges and Dedicated-High-Beam Spacing

Outer 1.5–1.8 / Inner 1.5–1.7 Inch

Step 01

Outer 1.5–1.8 / Inner 1.5–1.7 Inch

Keep each module within the position-specific range and match the outer carrier orientation.

Space Inner Dedicated High Beams

Step 02

Space Inner Dedicated High Beams

The photo targets 80 mm total projector length including spacers: one thick spacer for the laser high-beam example; one thick plus one thin for the short standard high-beam example.

Set Outermost Slotted Holes

Step 03

Set Outermost Slotted Holes

Move 1.5–1.7 inch outermost projectors inward as far as possible to match the illustrated clearance arrangement.

06 Electrical reference

Follow This Configuration’s Electrical Requirements

2025 Qashqai decoder circuit reference
Photo labels decoder signal, negative, high-beam positive and low-beam positive. Verify actual circuits and use the Nissan decoder with harness power.

Supplier Instruction

Use the supplier-specified Nissan decoder and power the replacement modules through a wiring harness. The connector photo labels decoder signal, negative, high-beam positive and low-beam positive, but does not supply numbered pins or a universal wire-colour map. Identify the actual connector orientation and verify these circuits before connection; do not reuse another Qashqai variant’s wire definitions.

Test low/high switching, warning behavior and clearance during adjustment movement before final sealing.

07 Components to confirm

Match the Complete Kit

Four-Module Carrier Pair

Correct driver/passenger side and outer plate orientation.

Position-Matched Modules

Outer 1.5–1.8 inch; inner 1.5–1.7 inch.

Plastic Spacers and OEM Ball Stud

Function-specific inner spacing and transferred original ball screw.

Nissan Decoder and Power Harness

Use harness power and verify the connector circuit functions.

08 Installation result

Completed Nissan Qashqai Classic Glory Headlamp

Nissan Qashqai Classic Glory Matrix Retrofit completed

Confirm beam aim, electrical behavior, adjustment travel and cover clearance before final sealing.

09 Installation photographs

Detailed Installation References

10 Frequently asked questions

Nissan Qashqai Classic Glory FAQ

How many matrix projectors fit?

Four per lamp, eight across the pair.

Are inner and outer size ranges identical?

No. Outer positions accept 1.5–1.8 inch modules; inner positions accept 1.5–1.7 inch modules.

What electrical arrangement is required?

The supplier specifies its Nissan decoder and wiring-harness power for the replacement modules.

How are inner dedicated high beams spaced?

Use the supplied plastic spacers. The photo shows one thick spacer for a laser dedicated-high-beam unit, or one thick plus one thin for a short standard high-beam unit; target total illustrated length including spacers is 80 mm.

How should the outermost slots be set?

For 1.5–1.7 inch projectors, the photo directs moving the outermost unit inward as far as possible.

Does the trim need modification?

Yes. The photos show local center and upper trim relief, followed by fitting the frame and checking projector clearance. The inner projector group also has separate height adjustment.

Technical reference: Supplier article 1192 and supplied installation photographs.

Related Headlight Retrofit Cases

Match Your Nissan Qashqai Classic Glory Kit

Send your lamp label and intended projector configuration.

Request This SolutionContact Royalin

REQUEST A BUSINESS SOLUTION

For retrofit shops, distributors and automotive lighting businesses.

We supply automotive lighting retrofit solutions and components exclusively for business customers worldwide.

1. Your Business
2. Your Vehicle
3. Contact Information
4. Your Message (Optional)

We will reply within 1 business day.