Mercedes-Benz GLS X166 Halogen Projector Retrofit
A mechanical guide covering original lower mounting-hole retention, controlled plastic-carrier cutting, direct front mounting and clip/retaining-ring assembly.
GLS X166 Headlamp ReferenceParallel-Import GLS Halogen Bracket Application
The supplier identifies the parallel-import base-halogen lamp. Verify the original plastic carrier, lower fixing holes and ball-stud arrangement against the supplied reference.
- Models
- Mercedes-Benz GLS X166
- Years
- 2017–2019 supplied model range
- Headlamp
- Parallel-import base-halogen reference
- Layout
- Front-mounted projector on replacement bracket
- Factory Parts
- Lower mounting holes, metal ball stud and original screws retained

Preserve both lower original mounting holes.
Match front/back orientation and the metal ball-stud side.
Fit the blue clip first, followed by the metal retaining ring.
Retain Lower Holes and Check Bracket Orientation
Retained Lower Support
Cut only the documented upper section while keeping both lower original holes intact.
Metal Ball-Stud Side
Install the metal bracket with the stud on the illustrated side. Do not reverse its front/back orientation.
Local Clearance
Grind the illustrated contact areas only where necessary to clear the replacement projector.
Match the Parallel-Import Halogen Lamp
Documented Configuration
- GLS X166, supplied 2017–2019 model range
- Parallel-import base-halogen lamp reference
- Original lower plastic support and mounting holes
- Documented ball stud, blue clip and retaining ring
Not Automatically Confirmed
- Other trims, markets or lamp internals
- Reversed metal-bracket orientation
- Cuts affecting the retained lower holes
- Wiring or sealant assumptions from other models
Request Matching
Send lamp label, market version, original carrier and mounting photographs.
GLS Halogen Carrier Installation Sequence
Prepare the Original Plastic Carrier
Retain the two lower original mounting holes and cut away the illustrated upper section.
Fit the Metal Bracket in the Correct Direction
Install the replacement bracket directly. Check front/back orientation and keep the metal ball stud on the documented side.
Front-Mount the Replacement Projector
Mount the projector directly from the front and secure the documented fixing points.
Relieve Local Interference
Inspect the illustrated lower contact areas and grind only the material that interferes with the replacement projector.
Fit the Blue Clip and Retaining Ring
Install the blue clip first, then the metal retaining ring in the illustrated arrangement.
Reinstall the Assembly and Original Screws
Return the assembly to the housing, refit the original screws and restore the decorative trim frame.
Selected Installation Details
Bracket, Projector, Original Support and Retainers
Replacement Metal Bracket
Match its front/back orientation and original metal ball-stud side.
Replacement Projector
Confirm direct front mounting and lower clearance.
Original Lower Plastic Support
Retain both lower mounting holes and original screws.
Blue Clip and Metal Ring
Fit the blue clip before the metal retaining ring.
Restore Original Fixings and Decorative Trim
Rear Assembly Detail
Compare the assembled carrier and projector to the supplied rear view.
Clip and Ring Order
Blue clip first, metal retaining ring second.
Original Screws
Refit the original screws at the documented points.


GLS X166 Halogen Retrofit FAQ
Which lamp version is documented?
The supplier identifies a parallel-import Mercedes-Benz GLS base-halogen lamp. This case uses the supplied 2017–2019 X166 model range; match the actual lamp and original carrier rather than assuming all GLS lamps share this layout.
Which original mounting points are retained?
Retain the two lower original mounting holes and cut off the upper section of the plastic carrier only as illustrated.
Which way does the metal bracket face?
Match the photographed front/back orientation. The original metal ball stud must be on the illustrated side; do not reverse the bracket.
How is the replacement projector mounted?
Front-mount the projector directly on the metal bracket. Inspect the marked lower areas and grind only those that cause interference.
What is the clip and ring installation order?
Fit the blue clip first, then install the metal retaining ring. Refit the original screws when returning the assembly to the housing.
Does the source specify wiring or lamp sealant?
No connector pinout, harness specification or sealant type is provided in this tutorial. Verify those details separately for the actual lamp and selected projector.
Technical reference: Supplied installation photography and article 233. Verify actual lamp, retained mounting points, orientation and electrical compatibility before installation.
Related Headlight Retrofit Cases
Match Your GLS Halogen Retrofit Kit
Send the original lamp label and plastic-carrier photographs.










