01 Hero · G700 four-matrix case

2025

JETOUR Zongheng G700 Four-Matrix Retrofit

Four 1.5–1.8 Inch Modules per Headlamp

INSTALLATION REFERENCE

A four-module matrix conversion in each lamp, using a main carrier and an adjustable high-beam carrier. Retain the factory light sources and use an independent-negative wide-voltage harness. The illustrated rear access point permits later independent high-beam height adjustment.

◇ Four Modules per Lamp ◇ Adjustable High Beam ◇ Retain OEM Sources

View Installation Guide

2025 JETOUR Zongheng G700 front headlamp2025 Four-Matrix Reference
02 Vehicle application

G700 Four-Matrix Bracket Application

Models
JETOUR Zongheng G700
Years
2025
Headlamp
Pictured OEM Xingyu hard-cure-sealant headlamp
Layout
Four matrix modules per lamp; eight across the headlamp pair
Factory Parts
Retain OEM light sources; restore decorative plate and trim bezel
G700 matrix carriers clips trim plates and ball-joint hardware
1.5–1.8 Inch Modules

The source specifies this range for all four matrix positions.

Independent High-Beam Aim

Prepare the ball joints and rear adjustment access as shown.

Separate Negative Circuits

Use an independent-negative wide-voltage harness and retain OEM sources.

03 Carrier structure

Main Carrier and Adjustable High-Beam Carrier

Select the Correct Lamp Side

Step 01

Select the Correct Lamp Side

The reference identifies passenger-side brackets. Bend the marked mounting tab down and install the accessory at that location.

Prepare the High-Beam Subcarrier

Step 02

Prepare the High-Beam Subcarrier

Install the indicated clips before mounting the high-beam carrier on the main carrier.

04 Compatibility notice

Match All Four Modules and the Adjustment Hardware

Documented Configuration

  • 2025 G700 Xingyu reference lamp
  • Four 1.5–1.8 inch matrix modules in each lamp
  • Main carrier plus adjustable high-beam subcarrier
  • Retained OEM sources and independent-negative harness

Do Not Assume

  • The Hella-pattern kit uses this installation sequence
  • The approximate ball-joint setting is final beam aim
  • Low- and high-beam negatives may be combined
  • Other lamp variants match without inspection

Request Matching

Send lamp labels, all module dimensions and carrier mounting photographs.

Request Verification

04A Bracket assembly

Prepare Ball Joints Before Fitting the Projectors

Install the Carrier Clips

Step 01

Install the Carrier Clips

Fit the hardware in the photographed main and high-beam carrier positions.

Set the Initial Ball-Joint Positions

Step 02

Set the Initial Ball-Joint Positions

Align the indicated upper ball center with the main bracket plane. The other indicated ball center is approximately 17 mm from the steel bracket plane. These are initial settings; fine-tune later.

Set the Carriers Roughly Parallel

Step 03

Set the Carriers Roughly Parallel

Assemble the high-beam carrier onto the main carrier and adjust them until roughly parallel.

05 Installation process

Install the Matrix Assembly and Preserve Adjustment Access

Remove the Front Cover

Step 01

Remove the Front Cover

Open the Xingyu hard-cure-sealant lamp while protecting retained components.

Remove the Trim Bezel

Step 02

Remove the Trim Bezel

Remove the original surround to access the factory optics.

Release the Original Assemblies Carefully

Step 03

Release the Original Assemblies Carefully

The marked clip is difficult to remove. Handle it carefully and retain the required original light sources.

Check the Completed Carrier

Step 04

Check the Completed Carrier

Confirm clips, ball joints and carrier alignment before installing modules.

Fit All Four Matrix Modules

Step 05

Fit All Four Matrix Modules

The documented carrier accepts 1.5–1.8 inch modules. Secure each module and inspect actual body clearance.

Install the Decorative Plate

Step 06

Install the Decorative Plate

Fasten the decorative plate at the illustrated self-tapping screw locations.

Install the Carrier in the Housing

Step 07

Install the Carrier in the Housing

Seat the assembly. The marked small rear-housing opening provides later independent high-beam height adjustment; match the illustrated location.

Restore the Trim Bezel

Step 08

Restore the Trim Bezel

Refit the surround and check clearance around all four modules.

Test and Complete the Headlamp

Step 09

Test and Complete the Headlamp

Verify both beam functions, high-beam adjustment travel and final beam aim before sealing.

06 Electrical reference

Retain OEM Sources and Use Independent-Negative Wiring

The supplier explicitly requires retaining the original light sources and using an independent-negative wide-voltage harness. Preserve the separate low- and high-beam negative circuits.

G700 low-beam positive and negative source connection
Follow the low-beam positive and negative arrows in the photographed source connection.
G700 high-beam positive and negative source connection
Follow the separate high-beam positive and negative arrows. No universal numbered pin assignments or extra decoder specification are provided.
07 Components to confirm

Match the Complete Four-Matrix Kit

Main and High-Beam Carriers

Match the side, clips and roughly parallel starting alignment.

Four Matrix Modules

Use 1.5–1.8 inch bodies and verify actual clearance.

Ball Joints and Trim Plate

Use the photographed initial settings and self-tapping plate fixings.

Independent-Negative Harness

Retain the OEM sources and keep negative circuits separate.

08 Installation result

Completed G700 Matrix Headlamp

Completed 2025 G700 four-matrix projector installation

Confirm low/high beam operation, independent high-beam height adjustment, retained source operation and cover clearance before final sealing.

09 Installation photographs

G700 Matrix Assembly Details

10 Frequently asked questions

G700 Four-Matrix Retrofit FAQ

How many matrix modules fit?

The supplier specifies four modules in each lamp, eight across the pair, supporting 1.5–1.8 inch matrix projectors.

Must the original light sources be retained?

Yes. Retain the factory light sources and use an independent-negative wide-voltage harness.

What is the initial ball-joint setting?

The photo aligns one indicated ball center with the main bracket plane and places the other about 17 mm from the steel bracket plane. These are approximate starting settings, followed by adjustment.

How are the two carriers aligned?

Install the clips and ball joints, assemble the high-beam carrier onto the main carrier, and adjust them until roughly parallel.

Can high-beam height be adjusted independently?

Yes. The supplier photo identifies a small rear-housing opening for later independent high-beam height adjustment. Match its location to the actual assembly.

What must be checked before sealing?

Check all module fixings, separate low/high beam wiring, retained source operation, adjustment movement, beam aim and cover clearance.

Technical reference: Supplier article 1451 and supplied photographs. Confirm module size, ball-joint initial alignment, rear adjustment access and independent-negative harness connections.

Related Headlight Retrofit Cases

Match Your G700 Matrix Kit

Send the lamp label, matrix dimensions and mounting details for matching.

Request This SolutionContact Royalin

REQUEST A BUSINESS SOLUTION

For retrofit shops, distributors and automotive lighting businesses.

We supply automotive lighting retrofit solutions and components exclusively for business customers worldwide.

1. Your Business
2. Your Vehicle
3. Contact Information
4. Your Message (Optional)

We will reply within 1 business day.