A four-projector conversion across the headlamp pair, with two projector positions in each lamp. The documented route uses a quad-projector harness and Nissan-type decoder, with front-trim clearance checked before applying new sealing rope.
Tank 300 Reference LampTank 300 Quad-Projector Bracket Application
- Models
- GWM Tank 300
- Years
- 2021
- Headlamp
- Pictured OEM Haval-marked lamp; hard-cure sealant
- Layout
- Two stacked projector positions per lamp; four projectors across the pair
- Factory Parts
- DRL support and front trim require local relief; test-fit the cover before resealing

Show and verify the upper and lower optics together.
The supplier specifies a quad-projector harness and Nissan-type decoder.
Do not add sealing rope before front-trim clearance is confirmed.
Fit Both Projectors and Their Shrouds
Upper and Lower Projectors
The installation photograph states that standard projectors fit directly without rear clearance modification. Verify the chosen bodies against the actual lamp.
Both Projector Shrouds
Install both shrouds and inspect their front clearance against the DRL support and original trim.
Confirm the Quad Route and Front Clearance
Documented Configuration
- 2021 Tank 300 reference lamp
- Quad Hella 5 bracket conversion
- Quad-projector harness and Nissan-type decoder
- Front trim relief and cover test-fit
Do Not Assume
- The separate matrix kit uses this procedure
- All projector bodies fit without verification
- The original front trim needs no cutting
- Wire color alone identifies decoder signals
Request Matching
Send the lamp label, projector dimensions and decoder connector photographs.
Open, Clean and Install the Shared Carrier
Open the Front Cover
Open the hard-cure-sealant lamp and retain the original trim for the documented modification.
Remove the Trim Frames
Remove the original trim and optical surrounds to expose both projector positions.
Cool the Sealant Before Removal
The supplied photo directs complete cooling before removing rear-housing sealant. It notes that a little alcohol in the groove and rolling sealant out with needle-nose pliers may help; keep solvents away from hot surfaces and ignition sources.
Install the Housing Clips
Fit the illustrated blue and white clips in their corresponding rear-housing positions.
Install the Main Bracket
Seat the carrier and remove the pictured white desiccant packets as directed by the installation photo.
Fit Both Projectors
Fit and secure both optical modules, then check their alignment and rear clearance.
Protect the Light Guide While Relieving the Support
Install Both Shrouds
Fit the upper and lower shrouds before checking the surrounding frame.
Trim the Center of the DRL Support
Remove only the marked support area. Take care not to cut the light guide.
Inspect Front Interference
Compare the front detail with the reference and check clearance around the projector and DRL assembly.
Relieve Areas A, B and C Before Adding Sealing Rope
Identify the Three Areas
The photo marks front-trim areas A, B and C for relief.
Check the Approximate Width
The reference shows each area at approximately 65 mm wide. Verify the actual interference rather than cutting blindly to a nominal measurement.
Match Area A Detail
The detail marks 13 mm at area A. Match its photographed direction and shape; do not apply this measurement to all areas.
Match Area B Detail
Use the supplied area B photograph to check the local cut profile.
Match Area C Detail
Compare area C with the reference and verify projector clearance.
Close the Cover for a Dry Test-Fit
After cleaning out the old sealant, do not lay new sealing rope yet. Fit the cover and confirm front-trim clearance first; seal only after the fit is confirmed.
Quad Harness and Nissan-Type Decoder
The supplier specifies a quad-projector harness and says a Nissan decoder may be used for this documented conversion.


Match the Complete Quad Kit
Quad Hella 5 Carrier
Match the shared carrier and housing clips.
Four Projectors and Shrouds
Two optical positions per lamp; verify each body and shroud.
Quad-Projector Harness
Route and test both projector positions before sealing.
Nissan-Type Decoder
Match actual terminal functions; do not rely on ambiguous wire colors.
Completed Quad-Projector Headlamp

Check low/high beam operation, beam aim, DRL condition and front-cover clearance before final sealing and installation.
Tank 300 Quad Hella 5 Retrofit FAQ
Which kit is documented?
The reference covers the 2021 Tank 300 quad Hella 5 conversion. The supplier mentions a separate matrix kit, which is not covered by this procedure.
How many projectors are installed?
The pictured assembly has upper and lower projectors in each lamp, giving four across the headlamp pair.
Which electrical components are specified?
The supplier specifies a quad-projector harness and a Nissan-type decoder. Confirm actual connector functions before wiring.
Does the DRL support need modification?
Yes. The marked center of the support is relieved without cutting the light guide.
What are the front-trim dimensions?
The photographs identify areas A, B and C, each approximately 65 mm wide, with a separate 13 mm detail at area A. Follow the photo-specific shape and actual clearance.
When should new sealing rope be applied?
Only after trimming and a dry cover test-fit confirm clearance. The supplier explicitly warns not to add sealing rope immediately after cleaning the old sealant.
Technical reference: Supplier article 288 and supplied installation photographs. Confirm lamp specification, quad carrier fit, decoder terminals, DRL support, front-trim relief and cover test-fit before sealing.