Audi A6 C7.5 High-Spec Matrix Projector Retrofit
A high-spec A6L reference covering position-specific assemblies, guide-channel drilling alignment, transferred linkage and pre-sealing outer aim adjustment.
A6 C7.5 Linked Matrix Kit Application
The supplier specifies four 1.5–1.8-inch projectors per lamp. Both inner and outer assemblies are documented below; this is not the base-spec 25W rear-access bracket.
- Models
- Audi A6 C7 Facelift / C7.5; A6L reference
- Years
- 2016–2018
- Headlamp
- High-spec matrix application; pictured Hella hard-cure-sealant lamp
- Layout
- Four 1.5–1.8-inch projectors per lamp; linked inner/outer groups
- Factory Parts
- Original sleeve and link rod transferred; original trim locally relieved
Both accept 1.5–1.8-inch projectors.
Outer horizontal adjustment is limited.
Original-source removal depends on successful programming/coding.
Outer and Inner Carriers Have Different Requirements
Outer Position
- Fit the clip and original lubricating sleeve.
- Assemble the linkage components as shown.
- Set left/right aim before sealing because adjustment is limited.
Inner Position
- Fit the bearing and front-mounted small link plate.
- Install the clip, projectors and side trim.
- Restore the original link rod; later external horizontal adjustment remains available.
Confirm the High-Spec Matrix Configuration
Documented Configuration
- 2016–2018 A6L high-spec matrix kit
- Four 1.5–1.8-inch projectors per lamp
- Linked inner and outer carrier groups
- Specialist coding can permit source removal
Not Automatically Confirmed
- Base-spec 25W or other unmatched lamps
- Removing sources without confirmed coding
- Assuming unlimited outer horizontal travel
- Automatic factory adaptive-matrix functionality after conversion
Request Matching
Send the lamp label, internal layout and intended projector dimensions.
Matrix Carrier Installation Sequence
Open the Front Lens
The pictured original Hella lamp uses hard-cure sealant. Open the front cover for the matrix carrier installation.
Remove Trim and the Original Reflector Assembly
Remove the decorative trim and original reflector assembly. Keep documented reusable linkage parts for transfer.
Prepare the Ball-Stud Base
Remove the original ball stud, trim away the marked base and seal the resulting hole as illustrated.
Locate the Guide Reference before Drilling
Align the bracket notch with the original guide-channel edge. Only then mark the holes; the following source view specifies 3 mm drilling and screw fixing.
Install the Outer Projector Carrier
Fit its clip, original lubricating sleeve and linkage components. The outer position accepts 1.5–1.8-inch projectors; set horizontal aim before sealing.
Install the Inner Carrier and Restore the Link Rod
Fit the bearing, front-mounted link plate, clip and side trim. Install the inner group and original link rod, then adjust the relative vertical aim of both groups.
Selected Installation Details
Drilling Reference, Linked Aim and Trim Clearance
3 mm Fixing Holes
Drill only after aligning the reference notch with the original guide-channel edge.
Relative Vertical Aim
Adjust the inner/outer groups at the illustrated linkage point.
Three Local Trim Areas
Relieve only the marked interference points in the original decorative trim.
Carriers, Projectors and Linked Adjustment Parts
Outer Carrier Assembly
Match the clip, sleeve and linkage; pre-set limited horizontal adjustment.
Inner Carrier Assembly
Fit the bearing, front link plate, retaining clip and side trim.
1.5–1.8-Inch Projectors
The kit supports four projectors per lamp across the two positions.
Linked Adjustment Hardware
Restore the original link rod and set relative inner/outer vertical aim.
Verify Aim before Sealing
A6 C7.5 High-Spec Matrix FAQ
How many projectors can be installed?
Article 648 specifies four 1.5–1.8-inch projectors in each lamp, using outer and inner carrier assemblies with linked adjustment.
Must the original light sources remain?
The supplier states that programming/coding can permit the original sources to be omitted. Consult a specialist experienced in Audi coding; do not remove the sources on the assumption that no coding is needed.
Which aiming limitation matters before sealing?
Outer-position left/right adjustment is limited, so set its horizontal aim before sealing. The supplier states that the inner position remains externally adjustable afterward.
How is the drilling reference located?
Align the notch in the supplied reference bracket with the edge of the original guide channel before marking and drilling. The next reference specifies 3 mm holes and screw fixing.
Which original parts are transferred?
The photographs show transferring the original lubricating sleeve and original link rod, fitting the carrier bearings and clips, and moving the small link plate to the inner position as documented.
What trim and final adjustment are required?
Locally relieve the three marked interference areas in the original decorative trim. Set the relative vertical aim of the inner and outer projector groups at the illustrated linkage point and verify clearance before sealing.
Technical reference: Supplier article 648 and supplied photographs. Verify lamp identity, coding, drilling reference, linkage and pre-sealing aim.
Related Headlight Retrofit Cases
Match Your A6 C7.5 Matrix Kit
Send the lamp label, projector dimensions and coding plan.